Tuesday, August 13, 2013

a little B & E in the morning

So, while Neal was back up on Hornby, I was - where? As usual, here on Lopez.  The cat was pleased.

But I did get in some solid tiling sessions.

Because the wood flooring had fresh finish on it, there was only one way to get in the bathroom:  through the window.  So I set up a ladder, and crawled in and out, in and out.  Here's a shot through the window that shows the kickstep for the vanity, and the primer that I painted on the floor.
These are the cardboard dams that I built to contain the floor leveling compound.
And here's why:  we're splurging on heating elements under the tile, for our damp and chilly (9 month long) 'temperate' season.  Here they are, held in place with a glue gun.  I did this on a Saturday morning.  And found out that one of the blue tubes the electricians installed in the wall for the wiring (look to the left in this photo) did not end in the wall box.  Uh-oh.  Now what do I do?

I ended up taping the wire to the wall, and waiting until Monday.  And finding out that the wire exits under the box, not in it.  Well, the upstairs bathroom will be easier.
Then, two bags of leveling compound.  Much easier to use than I expected...how often can we say that??
The travertine floor tile, fully installed (four sessions later) but not grouted.
Here's the shower pan with grouting complete on the left side.  Looks nice with grout!
And here's a photo of the completed floor, grouted and sealed.  The photo looks plain, the actual is fabulous.  We love it.